The Final Project of the AV / AC Line of the 1st batch Verona – crossroad Vicenza takes into account the contents of the Preliminary Project approved by CIPE in addition to the requirements and Recommendations attached to Resolution no. 94/2006; of the variants required by the Local Authorities and geotechnical, environmental and archaeological surveys of the project itself imposed by the law.
imposed by the law; geotechnical, environmental and archaeological surveys of the project itself.
The new “design elements” classified as “substantive design variants” have been formally replicated in the Environmental Impact Study, subject to the procedure under Legislative Decree 163/2006, and in particular. SIA has considered the traits in variation between the variant of San Bonifacio and the realization of three overhead electrical power lines “in and out” plus one duct and the construction site set-up. The production sites and the environmental recovery where, in accordance with the requests and the addresses contained in the aforementioned CIPE act.